Vestas wins an order for 221 MW of wind power in the US

Vestas has received an order for 221 MW for a wind energy project in the US The wind farm consists of 46 V150-4.5 MW wind turbines, three V110-2.0 MW wind turbines in 2.2 MW operating mode and two V136-3.45 MW wind turbines in 3.6 MW operating mode.

The order includes the supply and commissioning of the wind turbines, as well as a 10-year Active Output Management 5000 (AOM 5000) service contract, designed to ensure optimized performance of the asset.

Turbine delivery begins in the third quarter of 2022 and commissioning is scheduled for the first quarter of 2023.