GDF SUEZ announces Marszewo wind farm completed

Marszewo, the third largest wind farm in Poland owned by TAURON Group was officially opened. Tractebel Engineering (GDF SUEZ) in Poland was Contract Engineer for this project.

The Marszewo wind farm has an installed capacity of 82 MW and is located in Postomino (S?awno County), Northern Poland. The wind farm consists of 41 turbines (manufactured VESTAS V80 and V90) of 2 MW each and its annual output is estimated at ca. 184 thousand MWh. A consortium made up of Iberdrola Engineering and Construction Poland Sp. and Iberdrola Ingenier