Vestas has secured a 15-year service contract covering 42 V90-2.0 MW wind turbines at the Topolog Dorobantu wind power plant in Tulcea County in Romania.
The last of the 42 wind turbines is expected to be installed within April this year.
The order has been placed by LUKERG Renew, a joint venture between ERG Renew and LUKOIL.
ERG Renew is Italy