During this last weekend, the electricity system operator issued orders regarding the maximum wind power penetration level, which at specific times, ranged between 11,000 MW and 14,979 MW; these technical restrictions had only a slight impact on production from wind power.
This event represented a new challenge that Red Eléctrica, as system operator, was well capable of managing without putting the security of the supply at risk.