Greenalia has 19 wind farms pending with 116 wind turbines with 526 megawatts of wind power

They will be located in Vilasantar, Aranga and a third wind farm between Arteixo, Culleredo and A Laracha. In Galicia, 116 wind turbines with 526 megawatts of wind power. So far in 2020, the Regionaal Ministry of the Environment has published the start of the environmental processing of a total of 19 wind farms in … Continue reading Greenalia has 19 wind farms pending with 116 wind turbines with 526 megawatts of wind power