Downloads

Activities in Spain

novedades

Project coordinated by:

Asociación Empresarial Eólica

Promoted by Plataforma Tecnológica

REOLTEC

AES

AES Wind Generation Expands UK Portfolio, Enters Polish Market

09 de abril de 2010

AES Wind Generation, a wholly owned subsidiary of AES Corporation (AES) announced today that it has acquired Your Energy Ltd (YEL), a United Kingdom (U.K.) based wind power developer.

AES Installs Energy Storage System in Chile

19 de noviembre de 2009

AES Energy Storage and A123 Systems announced the commercial operation of a 12 MW frequency regulation and spinning reserve project at AES Gener's Los Andes substation in the Atacama Desert, Chile.

AES Gener instala en Chile un sistema de baterías de litio para almacenar electricidad

19 de noviembre de 2009

El almacenamiento de electricidad es clave para el desarrollo de los vehículos eléctricos y las energías renovables no gestionables, como la eólica o la fotovoltaica.

AES Gener instala en Chile grandes baterías de litio para almacenar electricidad

17 de noviembre de 2009

Ya existen experiencias a menor a escala en otros países, pero AES Gener ha instalado en el desierto de Atacama el primer sistema de baterías de litio para el sector eléctrico.

AES wind farm in Kavarna is expected to be put in exploitation in October 2009

03 de septiembre de 2009

Bulgaria currently has 158 MW and is set to double that capacity when AES Corp. begins commercial operation on its 156 MW wind farm in Bulgarevo, near Kavarna in northeastern Bulgaria, in autumn 2009.

First wind turbine erected at Armenia

22 de agosto de 2009

The project is expected to be finished by the end of the year, at which time the 67 wind turbines will be functioning.

1

Subsidized by:

Plan Nacional de I+D+I 2008-2011

National Plan for Scientific Research,
Development and Technological Innovation, 2008-2011

Strategic Action Plan for Energy and Climate Change
File no. ECC- 590000-2008-141

FEDER
Web Design Codarfel 2009