Downloads

Activities in Spain

novedades

Project coordinated by:

Asociación Empresarial Eólica

Promoted by Plataforma Tecnológica

REOLTEC

AEE

The wind energy industry installed 727 MW in Spain in the first half, reaching 19,876 MW

03 de septiembre de 2010

The wind power installed capacity increased by 727 MW in the first half of the year in Spain, reaching 19,876 MW on 30 June, according to the Spanish Wind Energy Association (AEE).

Spanish companies have 9,210 MW of installed wind power outside Spain

09 de julio de 2010

1,200 MW of wind energy installed in 2009 operating in seventeen countries. U.S. accumulates more than 40% of the wind farm capacity installed outside Spain.

The cut in premiums for wind energy in Spain only affects 16% of installed capacity

09 de julio de 2010

The agreement between the Ministry of Industry and Spanish Wind Energy Association affect the wind power sector, but less than expected. Premiums for wind farm are small in Spain and below the European average.

Spain cuts subsidies for Wind Energy and Concentrating Solar Power

05 de julio de 2010

Spain has agreed with renewable energy associations to cut subsidies which have made the country leading producer of solar and wind power.

Spain willing to invest in wind power in Turkey

29 de mayo de 2010

"Spain is very experienced in wind energy, and Spanish companies want to invest in other countries," said Alberto Ceña, the technical director of the Spanish Wind Energy Association, or AEE.

AEE´s First Meeting on Risk Prevention in the Wind Power Sector

30 de abril de 2010

SGS will be participating in the I International Meeting on Risk Prevention in the Wind Energy Sector organized by AEE from May 11-12, 2010 in Barcelona, Spain.

Wind energy in Spain in 2009

23 de abril de 2010

2009 was one of the best years for wind power in Spain with 2,459 MW of new capacity added to the grid, second only to the record year of 2007, when 3,515 MW were added.

Spain installed 2,459 MW in 2009 reaching an accumulated wind power of 19,149 MW

06 de abril de 2010

Last year 2009 saw one of the largest annual increases on the installation of wind farms with 2,459 MW of new capacity (only behind 2007 with 3,515 MW) which reaches accumulated power of 19,149 MW at the start of 2010.

Manifiesto por el empleo en la eólica

17 de marzo de 2010

Tras la publicación del RDL 6/2009 se han perdido más de 6.000 empleos directos y más de 10.000 indirectos.

La AEE promueve junto a UGT y CC.OO. un manifiesto en defensa del empleo en el sector eólico

13 de marzo de 2010

La Asociación Empresarial Eólica (AEE) se ha unido a la Federación de Industrias Afines de UGT y a la Federación de Industria de CC.OO. para lanzar un manifiesto conjunto en defensa del empleo en el sector eólico.

1  2  3  4  5  >  >>

Subsidized by:

Plan Nacional de I+D+I 2008-2011

National Plan for Scientific Research,
Development and Technological Innovation, 2008-2011

Strategic Action Plan for Energy and Climate Change
File no. ECC- 590000-2008-141

FEDER
Web Design Codarfel 2009